Need
help?
Call 1-833-423-3367We answer

Maritimes / PEI

Charlottetown

Island plants get mainland capability without the wait.

What runs on Prince Edward Island

Prince Edward Island’s industry is concentrated and specialised. Potato and vegetable processing at scale, seafood and shellfish plants around the coast, dairy and food manufacturing, a bioscience and pharmaceutical manufacturing cluster centred on Charlottetown, and aerospace work at Slemon Park near Summerside. Behind them sit the island’s water, wastewater and power systems.

The constraint every island plant knows is supply. A part that is a day away on the mainland is a longer wait here, and a contractor who has to be flown or ferried in is a different proposition than one who drives across a bridge.

  • Potato and vegetable processing. Washing, grading, sorting and packaging line controls, high-volume conveyor systems.
  • Seafood and shellfish. Washdown-rated enclosures, grading and packing controls, refrigeration interfaces, corrosion-aware installation.
  • Bioscience and pharmaceutical manufacturing. Process controls, clean utilities, batch sequencing and data logging.
  • Dairy and food manufacturing. Batching, pasteurising and filling controls, clean-in-place sequencing.
  • Aerospace and precision manufacturing. Machine controls, test equipment integration, shop power and distribution.

Mainland capability without the wait

Island plants often end up with a compromise: either a local contractor whose scope stops at part of the problem, or a specialist from far enough away that every visit becomes a project. Bedford is close enough to drive and broad enough to finish the job.

Practically, that means a Charlottetown project can be scoped on site, built and bench-tested in the Dieppe shop, and delivered across the bridge as a working panel with its drawings. Site time is wiring and commissioning. It also means one contract instead of coordinating a designer, a panel builder, a programmer and an electrician across the strait.

The full scope is available on the island: PLC, HMI and SCADA programming and legacy migrations, industrial electrical installation by Red Seal electricians, custom control panels, robotics integration including palletizing and machine tending, and emergency response through Lifeline.

Working in Charlottetown

We have people serving the Island, and the Confederation Bridge makes this a drive rather than a shipment. Summerside and the western end of the island are a similar run. This is a drive, not a logistics exercise.

For planned work, panels travel from Dieppe already built and exercised, which keeps island site time short. For scheduled maintenance, the trip is short enough that a service programme is realistic to keep rather than aspirational.

When a line goes down, call 1-833-423-3367. Someone available answers, takes the details and gets the right people on it.

Straight answers

Common questions in Charlottetown

Who provides industrial automation in Charlottetown?Bedford Industrial Automation covers Prince Edward Island. We have people across the Maritimes, and we run our own panel shop. Controls design, custom control panels, PLC and HMI programming, industrial electrical work, robotics and ongoing service come from one team under one contract.
Is being off-island a problem for service?The bridge makes it a drive rather than a shipment. Charlottetown is under two hours from the shop, closer than Halifax. The bigger island issue is usually parts availability, which is why panel builds carry documented components and why spares get discussed during design rather than after a failure.
Which PLC platforms do you support?Five: Allen-Bradley (MicroLogix, CompactLogix and ControlLogix), Schneider Electric (Modicon), Omron (CP1, CJ, NJ and NX), Phoenix Contact (PLCnext) and Unitronics. Food and seafood processing lines on the island frequently run packaged OEM equipment with combined PLC and HMI units, which is exactly the Unitronics case.
Do you handle electrical permits and inspection on PEI?Industrial electrical work on Prince Edward Island is done to the Canadian Electrical Code, CSA C22.1, as adopted provincially. Permitting and inspection are part of the scope and get confirmed with you before work starts.

Ready when you are

Bring us your
Charlottetown project

Book a free consultation. We tell you straight whether we can help.