Bedford Industrial Automation is a SCADA system integrator New Brunswick and the wider Maritimes can reach by road, based in Dieppe with our own panel shop. We build on the SCADA platforms Maritime plants already run, and we recommend new ones based on tag count, licensing model, and who has to maintain the system after commissioning. Not based on what we feel like selling.
- Ignition: server licensing with unlimited tags and clients, a strong fit for plant-wide systems that need to grow.
- VTScada: developed in Nova Scotia, common in water and wastewater for its built-in redundancy and alarm notification.
- AVEVA: InTouch and System Platform, widely installed and often the starting point for modernization work.
- FactoryTalk View SE and ME: the natural choice when your plant is standardized on Allen-Bradley.
- Weintek and C-More: panel-mount HMI hardware for machine-level screens where a full SCADA client is more than the job needs.
Under the screens, we work in the protocols your equipment speaks: EtherNet/IP, Modbus TCP and RTU, PROFINET, OPC UA, and DNP3 for telemetry. We program the PLCs on the other end too, across Allen-Bradley, Schneider, Omron, Phoenix Contact, and Unitronics.
From plant floor to pump station
Plant-wide monitoring is the core job: one system that shows production, utilities, and packaging on consistent screens, with one alarm philosophy across all of it. Operators should not have to remember which of four aging terminals shows the boiler.
For municipalities and utilities, we build water and wastewater telemetry: lift stations, reservoirs, and well fields polled over cellular or licensed radio using DNP3 or Modbus, with store-and-forward for comms dropouts and alarm callout when a level or a pump fault needs a human.
Alarming and reporting get engineered, not bolted on. That means rationalized alarms with defined priorities and responses instead of a flood of nuisance chatter, and automatic shift, production, and compliance reports that pull from the historian instead of a clipboard.
Upgrade legacy SCADA, keep the history
The failure pattern is familiar. A PanelView Standard nobody can buy parts for. RSView32 or an old InTouch runtime on a Windows XP machine. One retired employee who knew how it all worked. The system still runs, so it never gets budget, until the day it does not run.
A migration does not have to mean starting from zero. Tag databases can be exported and mapped. Screens can be converted or rebuilt to current standards. Historian data can be migrated so ten years of trends survive the change. We stage the new system to run in parallel with the old one, then cut over in a planned window, so production does not pay for the upgrade twice.
Screens operators trust, in both languages
We design to high-performance HMI principles, in line with ISA 101 guidance: grey backgrounds, colour reserved for abnormal conditions, analog values shown against their normal operating ranges. On a screen like that, a developing problem stands out in seconds. On a rainbow mimic with forty blinking objects, it hides in plain sight.
In New Brunswick, crews work in English, French, or both. We build bilingual operator screens with language switching at runtime, so each operator reads navigation, alarm text, and messages in their working language. An alarm an operator only half-understands is an alarm that gets acknowledged and ignored.
From historian to decisions
A SCADA system that only shows live values is doing half the job. We set up historians with intent: which tags to log, at what rate, with deadbands tuned so the data stays useful without drowning the disk. Then we build the views that make the data pay.
- Dashboards that give a plant manager the day at a glance without opening operator screens.
- Downtime tracking that captures stop reasons at the machine, so the argument about the worst line ends with numbers.
- Trend tools operators can actually use during an upset, not just after one.
- Groundwork for OEE and regulatory reporting, fed by data you already produce.
One local team, from panel to screen
SCADA projects fail in the gaps between contractors. The integrator blames the electrician, the electrician blames the panel builder, and the schedule eats it. We close those gaps by owning all of it. Bedford designs the system, builds the control panels in our own shop, writes the PLC and SCADA code, sends Red Seal industrial electricians to install it, and commissions the result. Engineering-led, with a B.Eng on staff, and one company to call when something needs an answer.
That matters more out here. Maritime industry runs on seafood plants with hard seasonal windows, forestry and pulp operations far from any airport, and manufacturers who cannot idle a line while a remote-only firm books flights. Commissioning always surfaces something: a wiring fault, a comms link to a lift station that drops at night, a driver that will not connect. Someone has to stand in front of the panel. We serve Halifax, Truro, Amherst, Moncton, Fredericton, Saint John, and Charlottetown, and our people are already in the region. When you call the emergency line at 1-833-423-3367, a real person answers, the same team that built your system.